Recent News
PES to establish permanent fabrication base at Uttaranchal - PES has acquired land in ELDECO SIDCUL Industrial Park, Sitargunj, Uttaranchal for setting up of a permanent manufacturing...
More
PES begins the ISO 9001 certification process - PES has initiated system study and gap analysis for implementation of the ISO 9001...
More
 



PES AND HYDROELECTRIC POWER PLANTS:

About Hydro

PES in Hydro

PES in Electro


        Turbine scroll case for        Indravathi hydro project

Electro Mechanical Equipment
PES undertakes Site handling, Storage, Assembly, Erection, Testing and commissioning of complete Electro mechanical equipment including the following.

•  Turbines

•  Generators

•  Auxiliaries

•  Controls and Instrumentation

•  Balance of Plant


Major achievements

•  Number of projects executed               26

•  Number of machines installed               75

•  Cumulative generating capacity            3765 MW

•  Number of projects in progress             5

•  Number of machines in progress            20

•  Cumulative generating capacity in
    progress                                            3354 MW

•  Largest generating capacity of a single
    machine (executed)                             204 MW

Major projects executed
•  Nagarjuna Sagar                                 1 x 100 MW

•  Upper Kolab                                        4 x 80   MW

•  Sharavathi                                          7 x 103 MW

•  Upper Indravathi                                 4 x 150 MW

•  Srisailam left bank power house            6 x 150 MW

•  Ranganadi                                           3 x 135 MW

•  Sardar Sarovar RBPH                            6 x 203 MW
© Copyright 2006 PES Engineers Pvt. Ltd. All rights Reserved.
PES Today History Mission Management Landmarks
Hydro Power Nuclear Power Thermal Power Oil & gas , Steel
Executed Current Client List
Equipment & Machinary Human Resources
Penstock Gates Expansion joints Services
Design Capabilities Fabrication Shops