PROJECTS UNDER EXECUTION


Hydro Power

Hydro Electric

Nuclear

Maintenance


Details of Penstock/ Steel Liner/ Pressure Shaft Works Under Execution


Penstock stockyard At Koldam

Penstock Tunnel Portal For
Uhl Hydro project

S.No

Project

Client
1. Design, Fabrication and Installation of Pressure Shaft Liners for Parbati Hydro Electric Project Stage II for NHPC (for Gammon India) Gammon India Ltd.,
2. Fabrication and Erection of Steel Liners for Maneribhali HE Project, Stage II, Uttaranchal Govt. of Uttaranchal
3. Fabrication and Erection of Ferrules including Bell mouth section from Surge Shaft downstream to inclined portion of Penstock of Maneribhali Stage II HE Project Govt. of Uttaranchal
4. Penstock Steel Liner works for Koldam HE project of NTPC (for Gammon India Ltd) Gammon India Ltd.,
5. Execution of works and services related to Penstock and Associated Civil Works of Unit 7 & 8 OF Balimela HE project extension of Orissa Hydro power Corporation Ltd (Sub contract to M/s LMZ Energy (India) Ltd, New Delhi) LMZ Energy (India) Ltd
6. Supply, Fabrication,Testing, Painting, Transportation to Project site, Erection and Commissioning of Penstock and its accessories including Civil Works for Uhl Stage III HE Project (100 MW) in district Mandi, Himachal Pradesh Himachal Pradesh Jal Vidyut Vikas Nigam Ltd., Himachal Pradesh
7. Execution of EPC Contract of Civil, Hydro Mechanical and Electro Mechanical Works for 2X48MW Dikchu HE Project, Sikkim through Haridwar Infrastructure Limited Sneha Kinetic Power Projects Pvt. Ltd., Hyderabad

Top^
Hydro Turbine Generator Works Under Execution

Guidevane assembly for
Teesta (V) turbine project, Sikkim

View of runner assembly for bulb turbine at Tala Hydro project, Bhutan

S.No

Project

Client Technical
description
Tonnage
1. Erection, Testing and Commissioning of 6x204 MW Pump-Turbine, Motor-Generator sets, associated, auxiliary and ancillary equipments for River Bed Power House of Sardar Sarovar Narmada Project Sardar Sarovar Narmada Nigam Limited, Gujarat 204 MW, 6 Nos
Hitachi Pump
Turbine
15376 MT
2. Storage, Handling, Erection, Testing and Commissioning of the Electromechanical Equipment for Bhaglihar Hydro Electric Project, Stage-I, for Jammu & Kashmir State Power Development Corporation Limited. Siemens Limited, Power Generation Divn. Gurgaon 3x150 MW
VA- TECH make
Vertical Francis
Turbine
7800 MT
3. Storage, Handling, Erection, Testing and Commissioning of the Electro-Mechanical equipments of 3 x 170 MW for Teesta Hydro Electric Project, Mitsui & Co Ltd. Hyderabad - 3x170 MW
Toshiba Corpn
Vertical Francis
3606 MT
4. Erection, Testing and Commissioning of 6x170 MW Hydro Generating Sets including site transportation of Plant Materials at Tala Hydro Electric Project Site, Bhutan. Bharat Heavy Electricals Ltd., Kolkata 6x170 MW
BHEL Pelton
8794 MT
5. Execution of Works and Services related to Erection and Commissioning of Electro - Mechanical Equipments of Power House and Associated work of Unit-7&8 of Balimela Hydro Electric Project Extension LMZ Energy (India) Limited, New Delhi. 2x 75 MW
Electrosila make
Vertical Francis
turbine
1500 MT
6. Repair of Rotor poles of all Units of 150 MW Hydro Generating Unit and Repair of 8 Nos. of Spare Poles along with Overhauling of Turbine of Unit I and II of Upper Indravathi Power House OHPC, Upper Indravathi Hydro Electric Project, Mukhiguda - 7800 MT

Top^
Nuclear Power Plant Works Under Execution

Kudankulam Nuclear project

Image of water intake system for Kudankulam Nuclear project

S.No

Project

Client
1. Handling, Transportation, Pre-fabrication, Welding, Anti-Corrosive Painting, Installation, Erection, Inspection and Testing of Ducting/Piping, Instrument Tubing and Associated equipments along with accessories for ventilation and air conditioning unit for Kudankulam Nuclear Power Project Unit I and II NPCIL, Kudankulam,Tamil Nadu
2. Supply, Fabrication and Erection of Caisson Gates, Ballasting System and Miscellaneous Structural Steel Work for Caisson Structures at Kudankulam Nuclear Power Project, Tamil Nadu NPCIL, Kudankulam, Tamil Nadu

Top^
Refurbishment and Maintenance Projects

S.No

Project

Client
1. Day- to- day maintenance and Annual Planned Maintenance work of 3X135 MW Dikrong Power House and Associated Switchyards of Ranganadi H.E. project NEEPCO, Arunachal Pradesh
© Copyright 2006 PES Engineers Pvt. Ltd. All rights Reserved.
PES Today History Mission Management Landmarks
Hydro Power Nuclear Power Thermal Power Oil & gas , Steel
Executed Current Client List
Equipment & Machinary Human Resources
Penstock Gates Expansion joints Services
Design Capabilities Fabrication Shops