01 Mar
330 MW Kishanganga hydro project

330 MW Kishanganga hydro power project developed by NHPC was successfully commissioned in the 2nd week of March 2018. PES is proud to be associated with this prestigious project as the EPC contractor for design, supply and manufacture of pressure shaft steel liner nearly 1 km in length and 4 meters in diameter.