Electro Mechanical

  • Nagarjuna Sagar Pumped Storage Scheme Stage II (1 x 100 MW)
  • Upper Kolab HEP (4 x 80 MW)
  • Burla Power House (1 x 37.5 MW)
  • Servalar HEP (1 x 20 MW)
  • Kundah Power House V (1 x 21.6 MW)
  • Lower Mettur HEP (4 x 15 MW)
  • Lower Bhavani Dam (5 x 2 MW)
  • Shivapur Hydro Electric Power Station (2 x 9 MW)
  • Ghataprabha Dam Power House (2 x 16 MW)
  • Mani Dam Power House (2 x 4.5 MW)
  • Eastern Gandak Canal HEP (3 x 5 MW)
  • Rammam HEP (4 x 12.75 MW)
  • Lower Periyar HEP (3 x 60 MW)
  • Kodasalli Dam Power House (3 x 40 MW)
  • Narayanapur Power House (2 x 5.8 MW)
  • Teesta Canal Hydel Project (3 x 7.5 MW)
  • Doyang HEP (3 x 25 MW)
  • Upper Indravathi HEP (4 x 150 MW)
  • Gerusoppa Dam Power House (4 x 60 MW)
  • Ranganadi HEP (3 x 135 MW)
  • Bansagar HEP (2 x 15 MW)
  • Srisailam Left Bank HEP(6 x 153 MW)
  • Kopili HEP (1 x 25 MW)
  • Pykara HEP (3 x 50 MW)
  • Sardar Sarovar River Bed Project (6 x 204 MW)
  • Tala HEP (6 x 170 MW)
  • Balimela HEP (2 x 75 MW)
  • Teesta V HEP (3 x 170 MW)
  • Baglihar Stage I HEP (3 x 150 MW)
  • Middle Marshangdi HEP (2 x 39 MW)
  • Varahi Underground Power House (2 x 115 MW)
  • Teesta Low Dam HEP (4 x 33 MW)
  • Myntdu Leshka HWP (3 x 42 MW)
  • Chuzachen HEP (2 x 55 MW)
  • Sorang HEP (2 x 50 MW)
  • Baglihar Stage II HEP (3 x 150 MW)
  • Lower Jurala HEP (6 x 40 MW)